COST PLANNING FOR THE BUKIT MAS-KUBANGAN TOMPEK ROAD PRESERVATION PROJECT USING AHSP BINA MARGA 2025

Authors

  • Ilham Effendi Siregar Politeknik Negeri Medan ID
  • Asri Afriliany Surbakti Politeknik Negeri Medan ID
  • Lisherly Reginancy Debataraja Politeknik Negeri Medan ID
  • Rhini Wulan Dary Politeknik Negeri Medan ID

Keywords:

AHSP Bina Marga, Cost estimation, Road preservation, Unit price analysis, Work quantities.

Abstract

Accurate cost planning is essential for road preservation because work quantities, resource prices, and analytical coefficients determine the required budget. This study examines the Bukit Mas-Kubangan Tompek Road Preservation Project in Mandailing Natal Regency, North Sumatra, using the AHSP Bina Marga 2025 method. A quantitative approach combined project drawings, the previous project budget, local material and labor prices, equipment cost data, and relevant price schedules. The analysis comprised quantity takeoff, resource-based unit price analysis, budget compilation, and comparison with the previous planning document. The thesis reports a total estimate of IDR 17,312,745,239.00, compared with IDR 15,274,208,632.00 in the previous document, and a reported difference of IDR 2,038,536,606.00, or 13.35%. Asphalt pavement contributed the largest upward cost difference, while drainage and granular pavement recorded lower divisional estimates. The analysis associates these differences with resource price references, AHSP coefficients, equipment and labor productivity, and calculated quantities. The findings emphasize careful quantity verification and transparent unit price documentation. Numerical inconsistencies between some source tables remain unresolved; the reported totals are therefore presented as thesis findings rather than an independently reconciled bill of quantities.

Downloads

Download data is not yet available.

References

Bachtiar, H. I. (2007). Rencana & estimate real of cost. Bumi Aksara.

Direktorat Jenderal Bina Marga. (2024). Manual desain perkerasan jalan 2024 (MDP 2024) (03/M/BM/2024). Kementerian Pekerjaan Umum dan Perumahan Rakyat.

Gafar, M. A., & Dzinnur, C. T. I. (2022). Analisis perbandingan indeks rencana anggaran biaya pada proyek preservasi jalan Surabaya-Sidoarjo menggunakan metode analisa AHSP 2016 dan analisa AHSP 2022. Jurnal Ilmu-Ilmu Teknik-Sistem, 19(3), 1–9.

Katalog Alat Berat. (2013). Alat berat untuk proyek konstruksi. Kementerian Pekerjaan Umum.

Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2025). Analisis harga satuan pekerjaan (AHSP) bidang pekerjaan umum. Direktorat Jenderal Bina Konstruksi.

Mukomoko, J. A. (1987). Dasar penyusunan anggaran biaya bangunan. Gaya Media Pratama.

Oktaviani, R., Lusiana, & Rafie. (2025). Utilizing the AHSP method for cost estimation in road improvement at Jalan Parit Demang. Jurnal Teknik Sipil, 24(4), 1514–1522. https://doi.org/10.26418/jts.v24i4.86435

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® Guide) (7th ed.).

Riwibowo, N., Wijaya, O. D., Rohman, M., & Afan, M. M. (2023). Kajian analisis harga satuan pekerjaan (AHSP) SNI 2016 dibandingkan dengan Bina Marga 2020 pada pekerjaan lapis aspal AC-BC dan AC-WC. Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil, 28(1).

Siregar, I. E. (2026). Analisis perencanaan anggaran biaya proyek preservasi jalan Bukit Mas-Kubangan Tompek metode AHSP Bina Marga 2025 [Undergraduate thesis, Politeknik Negeri Medan].

Zulfansyah, M., Bakhtiar, A., & Putra, I. (2022). Komparasi antara analisa EI dan AHSP Bina Marga pada proyek pemeliharaan berkala jalan Paya Bakong Cluster IV. Jurnal Sipil Sains Terapan.

Bibliographic qualification: publication details follow the thesis reference list. Gafar and Dzinnur are dated 2023 in its literature chapter but 2022 in its bibliography; the bibliography year is used here. The complete page range for Riwibowo et al. is not supplied and requires confirmation.

Downloads

Published

2026-10-29

How to Cite

Ilham Effendi Siregar, Asri Afriliany Surbakti, Lisherly Reginancy Debataraja, & Rhini Wulan Dary. (2026). COST PLANNING FOR THE BUKIT MAS-KUBANGAN TOMPEK ROAD PRESERVATION PROJECT USING AHSP BINA MARGA 2025. Bulletin of Engineering Science, Technology and Industry, 4(4), 2411–2422. Retrieved from https://bestijournal.org/index.php/go/article/view/295

Issue

Section

Articles

Similar Articles

<< < 8 9 10 11 12 13 14 15 16 > >> 

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)