[1]
Panut Widodo, Riyanto Wibowo, and Yulianto Suala, “ANALYSIS OF MAIN ENGINE MAINTENANCE FOR THE VESSEL TB KARYA PACIFIC 2203 USING FAILURE MODE AND EFFECTS ANALYSIS (FMEA) AND RELIABILITY CENTERED MAINTENANCE (RCM) METHODS”, BESTI, vol. 5, no. 1, p. 230–236, Nov. 2026.